Process Plant Utilities and Environmental Design
CASE STUDY 2: Process Plant Utilities and Environmental Design, CILO 2 50 Marks Task 1: Develop a DWSIM Model of a Boiler Utility System 10 Marks The methyl chloride manufacturing facility described in Case Study 1 requires steam for process heating and utility services. Steam is supplied by an LPG-fired boiler using n-butane C₄H₁₀ as the representative fuel. The boiler operates with the following base-case conditions: • Fuel: Pure n-butane • Fuel inlet temperature: 25°C • Air inlet temperature: 25°C • Excess air: 20% • Combustion: Complete • Boiler feedwater temperature: 30°C • Boiler thermal efficiency: 80% • Required steam production: 2,000 kg/h • Steam pressure: 8 bar • Steam condition: Saturated vapour Using DWSIM: a Select and justify an appropriate thermodynamic property package, boiler-modelling approach, and combination of unit operations. b Construct and clearly label the boiler utility flowsheet, including the fuel supply, combustion air, combustion operation, boiler feedwater, steam production and flue-gas streams. c Obtain a converged model producing 2,000 kg/h of saturated steam at 8 bar absolute. d Report the required fuel and combustion-air flowrates, useful water-side heat duty, fuelenergy input, steam-production rate, and flue-gas flowrate and composition. e Clearly explain how the 80% boiler efficiency is implemented in the selected model. f Assess whether the calculated operating results are physically reasonable. Modelling note: No single DWSIM boiler configuration is prescribed. Students may select and justify an appropriate modelling approach and combination of unit operations. Assume dry air containing 21 mol% O₂ and 79 mol% N₂. Apply the boiler thermal efficiency of 80% on a lowerheating-value basis. Clearly explain how the combustion heat release, boiler efficiency and useful water-side heat duty are related in the selected model. Assume that all stated pressures are absolute and that pressure drops are negligible. Task 2: Conduct Boiler Sensitivity Study 10 Marks Using the converged base-case boiler model, vary the feedwater temperature through 30, 45, 60, 75 and 90°C. At every condition, maintain: 6 • steam production at 2,000 kg/h; • steam pressure at 8 bar absolute; • saturated-vapour condition; • boiler efficiency at 80%; • complete combustion; and • excess air at 20%. Adjust the fuel and combustion-air flowrates as necessary. For each feedwater temperature: a Determine the useful water-side heat duty. b Determine the required fuel consumption. c Calculate the percentage reduction in fuel consumption relative to the 30°C base case. d Plot and explain the resulting relationships. Plot appropriate relationships, explain the observed trends, and discuss the potential benefit of boiler-feedwater preheating. Adjust the combustion-air flowrate with the fuel flowrate to maintain 20% excess air
Subject: Chemical process calculation · Topic: DWSIM simulation